
Before maintenance, stop the system and safely isolate energy sources. Check tension, tracking, rollers and connections according to manufacturer instructions. Do not clean or adjust moving equipment.
Belt width, line length, speed and frame construction should be assessed together. The suitability of PVC, PU or rubber depends on the product, temperature, surface contact and cleaning method.
